We also advanced sustainable mobility by incorporating 44 electric vehicles into our fleet.
All our business centers operate under an ISO 14001 environmental management system, subject to internal audits. To enhance energy efficiency, we established a strategic work group and monitored consumption in Liverpool stores, allowing us to detect and correct increases. In 2024, we improved energy intensity, achieving a consumption of 101.23 kWh/m², a reduction of 3.51% compared to 2023. We also advanced sustainable mobility by incorporating 44 electric vehicles into our fleet. We acquired wind, hydroelectric, and solar sources, covering 39.08% of total renewable electricity consumption. By the end of 2024, we also added 29 locations with solar panel installations, including 23 Liverpool Stores, 2 Corporate Offices, 2 Galerías Shopping Centers, and 2 Suburbia stores.
We have 48 water conservation projects, including the usage of treated and rainwater. In 2024, we reinforced these efforts with two new treatment plants in Insurgentes and Santa Fe, the connection to three external treatment plants, and the installation of two rainwater harvesting systems, reducing our dependence on potable water. In addition, we replaced 572 toilets with water-saving models.
We promote waste separation to facilitate recycling and reuse within operational areas such as reception, warehouses, offices, and others. In addition, we work with suppliers that guarantee proper disposal and promote alternative uses. In 2024, we contributed to a roadmap to strengthen Integrated Waste Management, improving processes through the standardization and updating good practices. We added two biodigesters, reaching 10 units that have diverted more than 90 tons of organic waste from landfills. We also reinforced electronic recycling with 22 collection points in Liverpool and Suburbia.
48 water conservation projects, including the usage of treated and rainwater. In 2024, we reinforced these efforts with two new treatment plants in Insurgentes and Santa Fe.
In 2024, we improved energy intensity, achieving a consumption of 101.23 kWh/m², a reduction of 3.51% compared to 2023. By the end of 2024, we also added 29 locations with solar panel installations.